How deep should a screw pile be installed?

Back to the list of questions

How deep should a screw pile be installed?

A screw pile is installed deep enough for its helix to sit entirely below the frost depth of the soil. In Kyiv and the Kyiv region that means at least 0.9 m down to the top of the helix plus the length of the helix itself: for the SPGS F 60 × 3 × 2000 (650) pile, that puts 1550 mm in the ground. The exact depth is worked out for each site, because the frost depth standard varies by more than a factor of two across Ukraine.

Why everything depends on the helix

The load is carried not by the tube but by the helix blade bearing on compacted soil. In winter, water in the top layer freezes and the soil rises. This is called frost heave. If the helix sits in that layer, the soil pushes it up every winter, and the pile gradually works its way out of the ground along with the deck or fence on top. When the whole helix sits below that layer, frost cannot reach it.

How to work out the installation depth

The depth of the pile in the ground is the sum of two numbers:

  • A is the frost depth for your town or village under Ukrainian building codes (DBN);
  • L2 is the helix length, shown in brackets in the pile marking.

Approximate values of A: 0.5 m in the south and in Zakarpattia, about 0.9 m in Kyiv and the Kyiv region, and 1.1–1.2 m in the east. Use the standard for your area rather than your neighbours' experience: a 30 cm difference changes both the pile length and the budget.

Above ground there is also H, the height left for the frame. So the full pile length is L1 = A + L2 + H. The step-by-step method for pile length, diameter and spacing is in our article “Calculating a ground screw pile foundation”.

Examples for the Kyiv region

The frost depth here is about 900 mm.

The SPGS F 76 × 3 × 1500 (500) pile has a 500 mm helix, so 900 + 500 = 1400 mm goes into the ground and 100 mm stays above it. It suits cases where the frame sits almost at ground level.

The SPGS F 60 × 3 × 2000 (650) pile has a 650 mm helix, so 900 + 650 = 1550 mm goes into the ground and up to 450 mm stays above it. It is the choice for, say, a deck raised 300 mm off the ground. How many of these piles a deck needs is covered in our answer “How many screw piles does a 4×6 m deck need?”.

Can a pile go deeper or shallower than calculated?

Deeper is fine. If the pile turns too easily at the design depth, the soil there is weak, and it is screwed further down to a layer where resistance increases. Shallower is not acceptable: a pile that stops above the calculated depth leaves its helix in the frost layer.

When a pile suddenly stops early, it has usually hit a stone or construction debris. Hammering it down is forbidden, because impact bends the helix and the pile loses its load-bearing capacity. In that case we move the point or change the pile size. Screw piles are not used at all on stony ground or soil full of construction debris.

How to check the depth on site

The pile length is part of its marking: for SPGS F 60 × 3 × 2000 (650) it is 2000 mm. Subtract the height left above ground and you have the actual depth. Verticality is also watched during installation: the deviation must not exceed 2°, so the level is checked until the pile is in place.

Winter does not change the depth. The frost depth in the DBN standard already accounts for the coldest season, and frost only affects the effort needed during installation. More on this in our answer “Can screw piles be installed in winter?”.

Send us the site address, the type of structure and the height you need above ground on +38 050 431-70-60 (Viber, Telegram, WhatsApp), and we will select a pile of the right length. All our standard pile models are in the Ground screw piles section.


View screw piles in the catalogue

Back to the list of questions