Application: foundations for two-storey houses. Pile length: 2.0 to 3.5 m. Price from 4,180 UAH per pile.
Brand: SP Premier®
Category: Ground screw piles
The 108 mm ground screw pile (also called a ground screw) is the thickest in the SP Premier SPGS F range: 108 mm shaft, 3.5 mm wall. It is used for two-storey house foundations. The pile is made to order: 2–3 weeks, including galvanizing.
| Model | Length / helix, mm | Price, UAH |
|---|---|---|
| SPGS F 108 × 3.5 × 2000 (650) | 2000 / 650 | 4,180 |
| SPGS F 108 × 3.5 × 2500 (1000) | 2500 / 1000 | 5,142 |
| SPGS F 108 × 3.5 × 3000 (1000) | 3000 / 1000 | 5,776 |
| SPGS F 108 × 3.5 × 3500 (1000) | 3500 / 1000 | 6,410 |
Price from 4,180 UAH per pile (2.0 m). This is the manufacturer's retail price, price list of 13 October 2026. The price is the same with or without VAT: you can pay to the company account (LLC, with VAT) or to the sole proprietor account (FOP, without VAT). Installation is charged separately: see the price example below, and all installation prices on the page Installation of ground screw piles.
The SPGS F 102 pile has the same design with a thinner shaft: 102 mm instead of 108. The wall is the same, 3.5 mm. The outer helix diameter is 134 mm, against 140 mm on the 108 pile. Lengths of 2.0–3.5 m, helix, galvanizing and lead time are the same. The 102 mm pile is 198–301 UAH cheaper, depending on length.
| Model | Length / helix, mm | Price, UAH |
|---|---|---|
| SPGS F 102 × 3.5 × 2000 (650) | 2000 / 650 | 3,982 |
| SPGS F 102 × 3.5 × 2500 (1000) | 2500 / 1000 | 4,914 |
| SPGS F 102 × 3.5 × 3000 (1000) | 3000 / 1000 | 5,512 |
| SPGS F 102 × 3.5 × 3500 (1000) | 3500 / 1000 | 6,109 |
SP Premier will tell you which of the two suits your house when it does the calculation.
SP Premier recommends 108 and 102 mm piles for two-storey house foundations. For a single-storey house, an 89 mm pile is enough — it is thinner and cheaper. For a sauna, terrace, canopy, fence or gate, use the SPGS F 76 pile.
| 89 mm pile | 102 mm pile | 108 mm pile | |
|---|---|---|---|
| For which houses | single-storey | two-storey | two-storey |
| Wall | 3 mm | 3.5 mm | 3.5 mm |
| Outer helix diameter | 121 mm | 134 mm | 140 mm |
| Price | from 3,062 UAH | from 3,982 UAH | from 4,180 UAH |
| Availability | in stock | made to order | made to order |
How many piles you need depends on the house size, the load and the soil. You don't have to calculate this yourself: SP Premier will calculate the load, the pile layout, the pile length based on site geology, and the connection details for free. For architects and designers, SP Premier will also lay out the piles on a finished drawing for free. The company does not design houses. How the calculation works is explained in the article Calculating a ground screw pile foundation.
How much a 108 mm pile can carry depends on the soil on your site. That is why load capacity is determined only from geology, and table values are indicative: the same pile holds differently in different soils. Example: a 60 × 3 × 2000 pile carries from 0.4 to 1.8 t depending on the soil, a more than fourfold difference.
What SP Premier does instead of a table:
You don't need to choose the pile length yourself: SP Premier calculates it from your site geology. You can check the calculation with the formula L1 = A + L2 + H, where:
For Kyiv, the standard frost depth is 0.9 m. This standard assumes a winter with −30 °C holding for two weeks. In reality, the ground now freezes to 0.6 m. Example for a 2.5 m pile: 0.9 m standard frost depth + 1.0 m helix = 1.9 m, which leaves 0.6 m for the flange above the ground.
SP Premier screws in 108 mm piles with hydraulic rigs based on an AVANT loader and a MOROOKA tracked carrier — 750 UAH per metre of pile. With a mobile hydraulic unit — 850 UAH per metre. SP Premier will decide in the calculation what to use on your site. For example, installing a 2.5 m pile with machinery costs 1,875 UAH: 2.5 m × 750 UAH.
What else goes into the estimate:
A 108 mm pile can be screwed in by hand only up to 2.5 m long and only in soft soil — in spring or autumn, when the soil is moist. Otherwise you need machinery. The SP GS 1800 electric pile driver is designed for smaller piles — 42–76 mm in diameter and up to 1.5 m long.
The pile is only screwed in — it must not be driven. Deviation from vertical: no more than 2°. You don't need to concrete the shaft if the flange is no more than 600 mm above the ground. On a slope, where the flange is higher, the shaft is filled with cement-sand mix. If the frame was welded to the piles, coat the weld with zinc-rich paint after installation.
SP Premier makes 108 and 102 mm piles to order. Lead time is 2–3 weeks, including galvanizing. It depends on the number of piles and on whether the metal is available at the metal depots. Longer piles can also be made to order: up to 6.5 m for 108 mm and up to 6.0 m for 102 mm.
You can also buy the piles without installation. You can pick them up yourself in Kyiv or Brovary. Or a carrier — Nova Poshta, Delivery or SAT — will bring them at its own rates: by distance, weight or volume. If you order installation in Kyiv, the piles arrive together with the machinery and the crew.
SP Premier piles are also sold by partner metal depots, but only the piles, without installation.
There is no single figure for every site: the load capacity of a 108 mm pile is determined from site geology, and table values are indicative. Send the house dimensions and the site address, and SP Premier will calculate the load and the number of piles for free.
In shaft diameter (89 and 108 mm), wall (3 and 3.5 mm), outer helix diameter (121 and 140 mm) and purpose. The 89 mm pile is for single-storey houses, the 108 mm pile is for two-storey houses. The 89 mm pile is kept in stock, the 108 mm pile is made to order.
Yes, but only up to 2.5 m long and only in soft, moist soil in spring or autumn. In other cases you need machinery: the SP GS 1800 electric pile driver is designed for smaller piles — 42–76 mm in diameter and up to 1.5 m long. More details are in the answer Can a ground screw pile be screwed in by hand.
The 108 mm pile is made to order: 2–3 weeks, including galvanizing. Lead time depends on the number of piles and on whether the metal is available at the metal depots.
Send the house dimensions and the site address — SP Premier will calculate for free how many piles you need, what length they should be and how much installation will cost.
Phone: +38 050 431-70-60
Viber: +38 050 431-70-60
WhatsApp: +38 050 431-70-60
Telegram: +38 050 431-70-60
E-mail: info@sppremier.com.ua